Job completed for Emily T.

Completion date: September 23, 2026

Location: Smyrna, TN

Why did the customer contact us?

The customer called to address sagging or weakened floor support and wanted to reinforce the crawlspace structure to improve stability and floor levelness.

Solutions provided:

Installed 16 adjustable steel Power Posts, 5 ft or less, to reinforce and stabilize the floor system. Posts were secured under the existing 4x6 wood beam and installed on existing footings to provide additional structural support and help prevent future settling. The existing footings and beam reduced the cost by $75 per post.

Team members on this project:

Matt Behling, Bryant Roberts, Adam Swafford

Photos & Videos:

Structural Support Posts
Large View Icon
Structural Support Posts
Power Post
Large View Icon
Power Post
Power Posts Installed
Large View Icon
Power Posts Installed
Accurate Laser Measurements
Large View Icon
Accurate Laser Measurements